Logisticon Water Treatment has built 4 mobile high cube 20ft containers with RO units of 100 m3/h each. Special attention was paid to the design to fit all equipment in the container. Due to maintainability and operations, the unit is built in with a double floor, doors at both ends and a side door for operation.
Main technical details of the unit:
IAt the end of 2019, Logisticon Water Treatment started building a water treatment plant as part of an installation that produces large-scale polymer. The required polymer production water is pumped from the pump skid placed near the river through the water purification of Logisticon to the water buffers of the polymer production installation. The river water intake point consists of two pumps that can pump 200 m3 / h.