Pretreatment for DWP Botlek Fase II

The biggest demin water installation of The Netherlands (DWP phase I), already built by Logisticon for Evides Industry water, is running since December 2009. The feed water source for this installation is changed from drinking water into surface water in 2011. The surface water has to be treated using a combination of flocculation, Dissolved Air Flotation en Filtration (DAFF), sludge treatment with a lamella separator and decanter. Also built by Logisticon (Mechanical) and Elmon (Electrical). The installation has a capacity of over 2000 m3/h, and also contains HDPE piping up to DN1000. The installation was commissioned in August 2011.

    Logisticon stops using natural gas!


    The renovation at Logisticon is in full swing. The year started with the installation of a new portal crane on the new outdoor area at Ambachtsweg 34. After installing the outdoor lighting and finishing the street work, the outside area is completed.

    Read more All news

    Stay up to date and sign up for the online newsletter!

    By clicking on "subscribe" you also agree with the Privacy statement.