Pretreatment for DWP Botlek Fase II

The biggest demin water installation of The Netherlands (DWP phase I), already built by Logisticon for Evides Industry water, is running since December 2009. The feed water source for this installation is changed from drinking water into surface water in 2011. The surface water has to be treated using a combination of flocculation, Dissolved Air Flotation en Filtration (DAFF), sludge treatment with a lamella separator and decanter. Also built by Logisticon (Mechanical) and Elmon (Electrical). The installation has a capacity of over 2000 m3/h, and also contains HDPE piping up to DN1000. The installation was commissioned in August 2011.

    Logisticon Water Treatment bereikt in 2019 de energie duurzaamheidsdoelstellingen voor 2023


    De Rijksoverheid wil in 2050 bijna geen uitstoot meer van broeikasgassen. Er is vervolgens een Energieakkoord voor duurzame groei opgesteld met afspraken over het aandeel duurzame energie in 2023 en de weg naar 2050. Eén van de doelen is energiebesparing door toename van het aandeel hernieuwbare energieopwekking. Dit aandeel dient in 2023 meer dan 16% te zijn.

    Bekijk bericht Nieuwsoverzicht