Pretreatment for DWP Botlek Fase II

The biggest demin water installation of The Netherlands (DWP phase I), already built by Logisticon for Evides Industry water, is running since December 2009. The feed water source for this installation is changed from drinking water into surface water in 2011. The surface water has to be treated using a combination of flocculation, Dissolved Air Flotation en Filtration (DAFF), sludge treatment with a lamella separator and decanter. Also built by Logisticon (Mechanical) and Elmon (Electrical). The installation has a capacity of over 2000 m3/h, and also contains HDPE piping up to DN1000. The installation was commissioned in August 2011.

    Final installation installed within a week


    In a previous title, Logisticon reported the temporary installation at a French industrial customer. The temporary installation was replaced for a permanent installation after a few months, according to plan. The installation is largely redundant.

    Read more All news

    Stay up to date and sign up for the online newsletter!

    By clicking on "subscribe" you also agree with the Privacy statement.