Water purification contributes to savings on the required polymer


IAt the end of 2019, Logisticon Water Treatment started building a water treatment plant as part of an installation that produces large-scale polymer. The required polymer production water is pumped from the pump skid placed near the river through the water purification of Logisticon to the water buffers of the polymer production installation. The river water intake point consists of two pumps that can pump 200 m3 / h.

Read more All news

Stay up to date and sign up for the online newsletter!

By clicking on "subscribe" you also agree with the Privacy statement.