Maecenas sed diam eget risus varius blandit sit amet non magna. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Vestibulum id ligula porta felis euismod semper.
On this page, you are kept informed about the latest news items and developments at Logisticon. Of course, you can also sign up for the newsletter or follow Logisticon's LinkedIn page.
Meet Logisticon at Aquatech Amsterdam! - PP.KO.04 Logisticon will be present at Aquatech Amsterdam from November 6-9, 2023. As the leading trade fair for water technology, Aquatech features the latest industry products and innovations, covering everything
During a period of hydrochloric acid shortage, a chemical company turned to Logisticon Water Treatment for a solution. A shortage of hydrochloric acid has major consequences, which is why Logisticon was asked about the possibilities of an RO installation.
A Scandinavian chemical plant intends to secure the future supply of purified water for its production site. At present the make-up is water from a nearby lake, with no or little pre-treatment.
Logisticon has developed a new chemical storage and dosing solution. This solution is also referred to as a “Chemdose”. Up until now, it was available with a capacity of 10m3 and 15m3.
Last spring, Logisticon, in collaboration with Sweco, realized the first inDENSE® installation in the Netherlands at the Terneuzen sewage treatment plant.
Two factories were using the same wastewater treatment plant, managed by one of these factories. The factory managing the plant changed owners and therefore the possibility for the other factory to treat and discharge its wastewater also ended.
Logisticon celebrated its 35th anniversary with a large company party, which was not only dedicated to the anniversary, but also to the official commissioning of the renovated office building and production hall.
Logisticon is proud to announce that the company is celebrating its 35th anniversary this year. The company will open its doors on Saturday 10 June. Come by and visit the new office building and new factory hall, while enjoying a snack and a drink!
Logisticon’s office building and production hall have been completely renovated and have been fully operational for some time now. Because of these changes, Logisticon can serve its customers even better.
Logisticon has a first! A circular energy storage container will be installed at the company in Groot-Ammers. The energy storage system stores the energy generated by the 1000 solar panels on Logisticon’s building.
Logisticon proudly presents its corporate video, which highlights Logisticon’s core values of sustainability, trust and quality. The video gives a glimpse into the company’s world.
Logisticon has developed various chemical storage and dosing solutions. These solutions are called “Chemdose” units. The units are currently available from stock.
In times of environmental and climate change, it is a must to consider the environment and the future of our planet. Logisticon focuses on sustainable improvement of their own activities, but also thinks along for customers.
Substances such as PFOS, PFOA and products from the GenX process are receiving increasing attention due to the possible negative health effects. What is PFAS exactly and what are Logisticon's solutions for removing it from water?