Containerized demi-installation operational in a few days

'Quickly operational' is not always a necessity everywhere. But clients do experience it as very pleasant when it happens. This was also the case at a renowned chemical company in the Netherlands, where the demi-installation was outdated.  In February 2020 Logisticon received the order for the supply of a new installation.

Logisticon engineered and built a concept in which the new RO system was placed in a container, together with a demi-water storage tank. Partly thanks to the innovative way of thinking, Logisticon remains involved in the maintenance of the installation. As usual, the 15 m3 installation was tested on site and delivered fully operational and satisfactorily within a few days. 

Logisticon at Aquatech Amsterdam

Posted on: 21-10-2021 With over 15,000 visitors from across the planet, Aquatech Amsterdam is the leading trade fair for process, drinking and waste water. From 2 to 5 November, Logisticon Water...

First drinking water-methane removal using degassing membranes

Posted on: 08-10-2021 At the Vitens water production site in West-Terschelling about one-third of the drinking water is extracted from the freshwater aquifer located beneath the Waddenisland. The...

Reconstruction in full flow

Posted on: 24-09-2021 Following a well-earned vacation, reconstruction of the office building has restarted on Energieweg 2. The structural work was already completed before the holidays, now the...

Rapid intervention for 3-stage cobalt removal

Posted on: 17-09-2021 Logisticon Rental was recently approached by a chemical company that produces plastics in the Rotterdam port area. This client has a biological wastewater reactor, which breaks...

Stay up to date and sign up for the online newsletter!

By clicking on "subscribe" you also agree with the Privacy statement.