Measuring trailers for RIVM and Deltares

Logisticon has built two measuring trailers for RIVM and Deltares, which are designed to measure water quality in agricultural areas. These trailers are used to investigate the dynamics of nutrient and will measure downstream of the surface water in two agricultural areas. Because the equipment is built into a trailer, it is very mobile and can easily be moved to another location.

Logisticon previously built a similar trailer for Rijkswaterstaat. RIVM and Deltares were so enthusiastic about this concept that they started a tender procedure, which eventually resulted in the award in favour of Logisticon. These measuring trailers contain a with a submersible pump that pumps water through the measurement tank. This tank contains several types of measuring equipment such as pH, nitrate, conductivity, turbidity and phosphate. Besides, a sampling cabinet is integrated in the trailer. This cabinet stores the water samples for future laboratory measurements. All measured values ​​are visualized real time on the HMI display for analysis. With the implemented online data connection it is also possible to send the data of the measurement directly towards the costumer. In addition, built-in heating and air conditioning ensures the right conditions for the equipment to function optimally under different environmental circumstances.

Logisticon, RIVM and Deltares are all very satisfied with this successful collaboration.

Logisticon at Aquatech Amsterdam

Posted on: 21-10-2021 With over 15,000 visitors from across the planet, Aquatech Amsterdam is the leading trade fair for process, drinking and waste water. From 2 to 5 November, Logisticon Water...

First drinking water-methane removal using degassing membranes

Posted on: 08-10-2021 At the Vitens water production site in West-Terschelling about one-third of the drinking water is extracted from the freshwater aquifer located beneath the Waddenisland. The...

Reconstruction in full flow

Posted on: 24-09-2021 Following a well-earned vacation, reconstruction of the office building has restarted on Energieweg 2. The structural work was already completed before the holidays, now the...

Rapid intervention for 3-stage cobalt removal

Posted on: 17-09-2021 Logisticon Rental was recently approached by a chemical company that produces plastics in the Rotterdam port area. This client has a biological wastewater reactor, which breaks...

Stay up to date and sign up for the online newsletter!

By clicking on "subscribe" you also agree with the Privacy statement.