The previous update on the office building and production hall renovations dates from October 2021. A lot has happened since then and the office building on Energieweg 2 is now in use, to the delight of staff. As well as offering more space, the optimised air circulation enables daily work to continue; particularly important during Covid-19 pandemic.
As Logisticon already indicated, the company’s core values are clearly on display in the new office design and climate control. For instance, in line with Logisticon’s sustainable philosophy, the offices and production halls operate without natural gas. The requirements for air circulation and optimised cooling have also been considered, resulting in exceptional comfort and a healthier indoor climate. Works to complete the outdoor terraces adjacent to the canteen and meeting room are currently in full flow.
Considerable progress has also been made in recent months in constructing the new production hall. After the steel structure being erected and the roof being placed on top, the floor is now also ready for use. Hard work on the design and layout ensures optimised premises capable of realising many fantastic projects for clients. Logisticon is delighted with the end result and the opportunities for growth this renovation offers.