The renovation continues

The renovation at Logisticon is in full swing. After earlier updates on the renovation, the video below shows how floor heating was placed and concrete was poured.

Logisticon will of course keep you up-to-date about the latest developments of the renovation. 

Floor heating & topping concrete

Logisticon provides suitable solution for drinking water treatment

Posted on: 21-05-2021 Logisticon Water Treatment supplied a containerized UF plant to improve drinking water quality for a Scandinavian municipality. For a long time the water quality was at the limit...

The renovation is in full swing!

Posted on: 29-04-2021 Logisticon is busy with the renovation. As mentioned earlier, the office building on Energieweg 2 will be completely adapted and expanded. In the accompanying video you can...

Logisticon builds surface water pilot for Dunea

Posted on: 23-04-2021 Dunea is looking for new drinking water sources because their current system, consisting of two river water sources (Maas and Lek) with 80 km of pipelines towards the dunes, is...

Knowledge and competence provide the appropriate solution

Posted on: 09-04-2021 As a result of an extensive pilot project for the treatment of surface water, Logisticon received an order from a Scandinavian food company for a redundant Ultrafiltration (UF)...

Stay up to date and sign up for the online newsletter!

By clicking on "subscribe" you also agree with the Privacy statement.