Uitbreiding verhuurparl met grote

Water purification contributes to savings on the required polymer

Posted on: 23-12-2020 At the end of 2019, Logisticon Water Treatment started building a water treatment plant as part of an installation that produces large-scale polymer. The required polymer...

Containerized demi-installation operational in a few days

Posted on: 16-12-2020 'Quickly operational' is not always a necessity everywhere. But clients do experience it as very pleasant when it happens. This was also the case at a renowned chemical...

We make sure the customer discharges clean water

Posted on: 04-12-2020 A large chemical concern in the Rotterdam port area started producing a number of new products in mid-2020. This has changed the composition of the total wastewater stream. It is...

Mobile ultrafiltration for drinking water production

Posted on: 13-11-2020 At the beginning of 2020 Logisticon Mobile Water Solutions delivered 4 containerized ultrafiltration systems to a customer in Brazil. These units have a total production capacity...

Stay up to date and sign up for the online newsletter!

By clicking on "subscribe" you also agree with the Privacy statement.