'Quickly operational' is not always a necessity everywhere. But clients do experience it as very pleasant when it happens. This was also the case at a renowned chemical company in the Netherlands, where the demi-installation was outdated. In February 2020 Logisticon received the order for the supply of a new installation.
Logisticon engineered and built a concept in which the new RO system was placed in a container, together with a demi-water storage tank. Partly thanks to the innovative way of thinking, Logisticon remains involved in the maintenance of the installation. As usual, the 15 m3 installation was tested on site and delivered fully operational and satisfactorily within a few days.