News water@logisticon.com +31(0)184 608260
inDENSE®: Improved sludge settleability and phosphate removal

Last spring, Logisticon, in collaboration with Sweco, realized the first inDENSE® installation in the Netherlands at the Terneuzen sewage treatment plant. The patented inDENSE® technology focuses on sludge selection by means of cyclones to improve the sludge’s settleability. With the cyclones, a continuous selection of the heavier sludge fraction takes place, which improves the settleability of the sludge (low sludge volume index) and makes it more constant (no spring peaks). The bio-P capacity also increases.

By implementing the inDENSE® technology, a substantial investment in an additional secondary settling tank can be avoided. The inDENSE® technology is built into the existing sludge line, without interruption of the process. Return sludge is picked up from an existing sludge pit, after which it is pumped to the cyclones. The solid fraction (the sludge that settles more easily) is returned to the treatment plant. The thin fraction (the less easily settleable sludge) leaves the treatment plant via the sludge line.

Benefits of inDENSE®:

  • Better sludge settleability – higher hydraulic load system
  • Improved biological phosphate removal
  • Low investment
  • Very compact system, requires little space
  • Low energy consumption and no chemical consumption

With the inDENSE® process, the sludge volume index is permanently reduced, which significantly increases the capacity of the treatment plant. The first results are promising. Long-term monitoring will reveal how the cyclones function over the seasons. With a low CAPEX, a considerable profit can be achieved.

Would you like to know more, or are you curious about what inDENSE® can do for you? Contact Logisticon at 0184-608260 or water@logisticon.com. Logisticon is happy to help you.

KEEP UP TO DATE

Sign up for the online newsletter and keep up to date with the latest developments and the water treatment projects of Logisticon Water Treatment.

More news
Project in the Spotlight: Future-Ready Wastewater Treatment for a Cheese Manufacturer
During the expansion of a production site near Sint Jansteen, one key question took centre stage: how can we ensure reliable and efficient wastewater treatment that meets today’s needs while also being ready for future growth?
Read more
A little something different form work!
The best ideas often come to life in between projects. That’s exactly how this staff initiative came about: the Tour D’Logisticon, and what a great experience it was!
Read more
The Water Framework Directive deadline is approaching
The deadline for the European Water Framework Directive (WFD) is getting closer.
Read more
MAKING WATER WORK
Sales. Rental. Service.