Logisticon provides temporally waste water treatment solution

At the end of 2019, a food company specialised in the refining of edible oils was confronted with the departure of the neighbouring company that was relocating its activities. Together these companies had a shared wastewater treatment plant ( wwtp).

 

With the announced departure, the wwtp would also close. Our customer was informed that there would be a short transition period before the treatment would be closed definitely. Something had to be done.

This sudden problem made it a logical choice to look for a rental installation in order to avoid costly downtime in production. Logisticon Rental has lots of experience in the field of oil/ fat and water separation and was therefore approached to help solve this problem. After an inventory and laboratory tests, a treatment plant was proposed consisting of coagulation and flocculation, after which the separation takes place in a classic DAF (Dissolved Air Flotation) installation. After this treatment, the purified water can be discharged.

Due to adequate actions by Logisticon Rental, an installation could be delivered and put into operation on time, which prevented the customer having to shut down production. In addition, Logisticon supports the customer in business operations by remotely monitoring the installation.

Innovative mobile trailer for sampling saves time and inconvenience

Posted on: 22-10-2021 Since 2010, in order to monitor public health, samples from discharge water have been taken in a standardised manner from the sediment and animal organisms contained in the...

Logisticon at Aquatech Amsterdam

Posted on: 21-10-2021 With over 15,000 visitors from across the planet, Aquatech Amsterdam is the leading trade fair for process, drinking and waste water. From 2 to 5 November, Logisticon Water...

First drinking water-methane removal using degassing membranes

Posted on: 08-10-2021 At the Vitens water production site in West-Terschelling about one-third of the drinking water is extracted from the freshwater aquifer located beneath the Waddenisland. The...

Reconstruction in full flow

Posted on: 24-09-2021 Following a well-earned vacation, reconstruction of the office building has restarted on Energieweg 2. The structural work was already completed before the holidays, now the...

Stay up to date and sign up for the online newsletter!

By clicking on "subscribe" you also agree with the Privacy statement.