News water@logisticon.com +31(0)184 608260
Logisticon supplies a sophisticated treatment installation: Bioterra can discharge again

At Bioterra in Genk (Belgium), soil is remediated either biologically or using a physical-chemical process. The soil that arrives by truck or ship is cleaned with water. Until recently, the waste water produced by the process was physically-chemically treated. However, this no longer met the local discharge regulations.

After extensive MBR tests, Logisticon Water Treatment designed, built and delivered a fullscale MBR installation in a 20ft container. A membrane compartment is integrated in this container, which houses the KOCH membranes.

Bio-Dynamics, the civil engineering partner in this project, developed a circular concrete tank-in-tank, in which nitrification and denitrification occur. Thanks to this sophisticated MBR solution, the treated waste water - app. 10 m³/hour - can once more be discharged into the adjacent river.

KEEP UP TO DATE

Sign up for the online newsletter and keep up to date with the latest developments and the water treatment projects of Logisticon Water Treatment.

More news
Project in the Spotlight: Future-Ready Wastewater Treatment for a Cheese Manufacturer
During the expansion of a production site near Sint Jansteen, one key question took centre stage: how can we ensure reliable and efficient wastewater treatment that meets today’s needs while also being ready for future growth?
Read more
A little something different form work!
The best ideas often come to life in between projects. That’s exactly how this staff initiative came about: the Tour D’Logisticon, and what a great experience it was!
Read more
The Water Framework Directive deadline is approaching
The deadline for the European Water Framework Directive (WFD) is getting closer.
Read more
MAKING WATER WORK
Sales. Rental. Service.