News water@logisticon.com +31(0)184 608260
MBR installation for industrial customer

Logisticon realised a membrane bioreactor (MBR) plant with a net production capacity of 80 m3/h for an industrial customer in the chemical industry, located in Ruhr area Germany. Due to the condition of treating different wastewater qualities and the required redundancy to operate 24/7 for 365 days, three separate MBR streets of each 40 m3/h are realised.

Prior to the realisation of the full-scale installation, the client carried out several pilots in cooperation with Logisticon. These involved testing of different types/manufacturers of MBR membranes: hollow fibre as well as flat sheet.

The new MBR plant is based on the application of Puron Pulsion membranes from Koch Separation Solutions. The MBR plant is fully automated including the ability to automatically clean the membranes. The plant was commissioned in early 2022 and is operating to the full satisfaction of the customer.

KEEP UP TO DATE

Sign up for the online newsletter and keep up to date with the latest developments and the water treatment projects of Logisticon Water Treatment.

More news
Project in the Spotlight: Future-Ready Wastewater Treatment for a Cheese Manufacturer
During the expansion of a production site near Sint Jansteen, one key question took centre stage: how can we ensure reliable and efficient wastewater treatment that meets today’s needs while also being ready for future growth?
Read more
A little something different form work!
The best ideas often come to life in between projects. That’s exactly how this staff initiative came about: the Tour D’Logisticon, and what a great experience it was!
Read more
The Water Framework Directive deadline is approaching
The deadline for the European Water Framework Directive (WFD) is getting closer.
Read more
MAKING WATER WORK
Sales. Rental. Service.