Problem

A French recycling company focused on processing and re-use of chlorinated hydrocarbons was confronted with high concentrations of TSS in the wastewater during start-up and scale-up of the new waste processing plant. To continue production, the discharge requirements had to be met.

Solution

Full-scale WWTP consisting of:

  • Pre-settling with two parallel Dortmund tanks
  • Lamella separation
  • Sand filtration
  • Chemical storage and dosing  

The sludge produced was further processed in an existing filter press and the effluent water is since then able to be discharged.