Problem
A large Dutch food producer (F&B) that produces French fries increased its production capacity, so that the existing wastewater treatment plant had to treat a higher volume of wastewater. The plant was too small for this and upgrades were needed. To prevent production loss a temporary rental solution was required.
Solution
Among other units, Logisticon installed 3 lamella clarifiers to increase the wastewater treatment capacity.
Benefits
Quick and reliable solution
Client gained time to upgrade the existing wastewater treatment plant