News water@logisticon.com +31(0)184 608260
Cleaner wastewater to sewer thanks to Logisticon
Cleaner wastewater to sewer thanks to Logisticon
Problem

A chemical company in North Brabant was facing stricter discharge requirements for their wastewater, which created the need to treat the water before it could be discharged to the sewer system. To meet these new requirements, the company asked Logisticon to design and implement a suitable solution.

Solution

Logisticon designed and built a complete wastewater treatment plant after thorough research and a pilot test. The plant includes coagulation, flocculation, pH correction, flotation, and sludge treatment via a chamber filter press. The chemical treatment causes insoluble substances to clump together and be separated by flotation. The treated water, after a period of fine tuning, now meets the set discharge standards and can be safely discharged to the sewer system.

Solution
MAKING WATER WORK
Sales. Rental. Service.